Y Roof Unit Assembly


4/6

Start w/ (Y) type roof, # (A) and (E), (C) and (G)
gzbkit4-1
Insert (Y) roof pointer into
the top roof (Pagoda)


gzbkit4-3
gzbkit4-2
Adjust roof by slightly
teetering the unit to connect
roof to wall panel.


gzbkit4-4
Make sure that all 4 pointers w/ roof (Y) are firmly placed
into the holes of the center brace of Pagoda.
Do not apply pegs yet till all roof sections are firmly placed.
gzbkit4-5 gzbkit4-6
PAGE: 1/6 2/6 3/6 4/6 5/6 6/6


© Copyright Pasar Bamboo Traders